Chelsea Flower Show
A few years have passed since I was involved in this project! It garnered a lot of attention at the time and still looks great 20 years on.
I worked up a 3D model from the Architects plans and then produced all the manufacturing drawings / specification as well as coordination with 3rd parties.
Below is some pictures and a couple of the surviving drawings.
Technical Design
2003
Chelsea
Jeff Dutt
Jeff Dutt
Cowley Structural Timberwork
Employed - Draughtsman
Type
Year
Location
Client
Architect
Engineering
Capacity